| Asset Type | Energy Infrastructure (Transmission Line and Station) |
| Status | Under Final Development (COD expected by end of 2027) |
| Asset Description | 10 km double-circuit 230kV transmission line and 230kV transformer station located within the city of Sault Ste. Marie. Among other connections, this asset will power Algoma Steel Inc. (large Canadian steelmaker)’s transition from using coal to clean electricity (via electric arc furnaces) and reduce its CO2 emissions by 70% (3 million tons annually). |
| Asset Revenues | The asset will be governed under the Ontario regulatory utility framework through which it will be entitled to recover all prudently incurred costs plus a regulated return on its debt and equity through a performance based ratemaking scheme. |
| Counterparty | Settlement counterparty: IESO (rated Aa3 by Moody’s) Regulator: Ontario Energy Board |
| Asset Type | Transportation Infrastructure |
| Status | Operational |
| Project Description | Largest container terminal operator at the Port of Montreal, Montreal Gateway Terminals operates two of the Port’s four international terminals. In 2018, the container volume totaled 900,000 TEU.1 |
| Asset Revenues | Container handling revenues, with rates ($/container basis) determined in medium-term contracts with each shipping line |
| Key Stakeholders | Lease: Port of Montreal |
| 1TEU stands for twenty-foot equivalent container units. |
| Asset Type | Transportation infrastructure |
| Status | Operational |
| Asset Description | Highway 407 is the world’s first all-electronic, open-access toll highway, stretching 108 kilometers from the west to the east of the Greater Toronto Area. The highway forms part of the 400-series highways, serving as a bypass of Highway 401 and a major east-west corridor across the suburbs to the north of the city. |
| Asset Revenues | 100% toll-based (all-electronic tolling) |
| Concession Expiry | 2098 (concession term: 99 years) |
| Project Website | For more information visit: www.407etr.com |
| Asset Type | Energy Infrastructure |
| Status | Operational (COD in February 2011) |
| Asset Description | Dokie is a 144 MW wind farm located on the top of two mountain ridges in the Peace River District of Northern British Columbia. The project is the largest operating wind farm in BC. |
| Asset Revenues | 100% of power produced is sold under a 25-year Power Purchase Agreement (PPA). |
| Conterparty | BC Hydro |
| PPA Expiry | 2036 (25 years following COD) |