| Asset Type | Energy Infrastructure |
| Status | Operational (COD dates between 2008 and Q1 2016) |
| Asset Description | 1,600 MW wind portfolio consisting of 12 assets in 7 states. Portfolio projects use a variety of tier 1 wind turbines (Vestas, Gamesa, GE, Suzlon), with operations and maintenance services being provided by original equipment manufacturers under long-term agreements. |
| Asset Revenues | 100% of power produced is sold to creditworthy investor owned utilities, municipal power agencies, and government entities under PPA with weighted average remaining life of 16 years. |
| PPA Expiry | 2023 - 2039 (Between 15 and 25 years ) |
| Asset Type | Energy Infrastructure (Solar Power) |
| Status | Operational |
| Asset Description | 691 MWdc / 465 MWac operational solar project located in southern Alberta. The project utilizes monocrystalline silicone bifacial modules supplied by JinkoSolar with single-axis trackers by NEXTracker. The project also includes an expansion opportunity representing an additional 124 MWdc / 83 MWac which is in its early development stage. |
| Asset Revenues | The project has a 15-year PPA with Amazon for 400 MW at a fixed tariff rate, which represents 86% of the capacity. The PPA includes the environmental attributes associated with the contracted production. The project will maintain a 14% merchant exposure to energy and carbon credits over the PPA period |
| Asset Type | Energy Infrastructure |
| Status | Operational (COD between November 2012 and October 2014) |
| Asset Description | Eight solar PV facilities in Ontario totalling 105.5 MWdc of aggregate generation capacity located in the municipalities of Brockville, Ottawa, Temiskaming, Mississipi Mills, and South Stormont. The installations were developed under the Ontario government's Feed-in-Tariff (FiT) program. |
| Asset Revenues | 100% of power produced is sold under 20-year Power Purchase Agreements (PPAs) |
| Counterparty | IESO |
| PPA Expiry | 2032 and onward (20 years following COD) |
| Asset Type | Energy and Social Infrastructure |
| Status | Operational |
| Asset Description | 50-year concession to operate, maintain and upgrade the Georgetown University utility system, which is all of the electric, steam and condensate, natural gas, chilled water and associated central assets serving the Main and Downtown campuses, and includes utility and energy services to the Jesuit Community, the Georgetown University Medical Center and MedStar Georgetown Hospital. The concessionaire will also implement energy conservation measures to achieve a 35% reduction in energy use intensity |
| Asset Revenues | In exchange for an upfront payment, the Concessionaire receives three revenues steams: (i) a starting fixed fee of $21.1 million that grows by ~$2.2 million per year until 2031, then growing at 1.5% per year; (ii) a return on investment for capital improvements made to the system over the term of the concession; and (iii) payment of operating costs on a pass-through basis |
| Counterparty | Georgetown University (S&P: A-; Moody’s: A3) |
| Concession Expiry | 2071 |